Aqua Pure D4 double-train IV manufacturing campus
FINAL INTEGRATED PROPOSAL • V10

Project Aqua Pure

A scalable PIC/S-aligned sterile IV manufacturing campus connecting clean utilities, compounding, double-train ISPM blow–fill, terminal sterilization, inspection, packing and controlled logistics.

195,050sq. ft. site basis
24,000BPH inspection basis
D4 production trains
3,564D4 pallet positions
12master packages

EXECUTIVE OVERVIEW

One controlled manufacturing chain, designed as a complete operating system.

The proposal consolidates the available master plans, equipment layouts and vendor references into a coordinated basis for design development, tendering, validation planning and regulatory engagement. D3 remains the baseline option; D4 is the strategic double-train configuration with approximately twice nominal production capacity.

PW/WFICompoundingISPMAutoclaveVIMPacking
Sheikhupura, Punjab31 km Lahore–Sheikhupura–Faisalabad Road

VISUAL DESIGN RECORD

BTI coordinated image boards

Eleven full-resolution boards arranged as campus, process, utility and logistics chapters.

11 boards

MASTER-PLAN DECISION

AQI-D3 baseline versus AQI-D4 double-train strategy

D4: 2× nominal capacity
AQI-D3 master plan
D3 • BASELINE

Reference operating configuration

190,780 sq. ft. building reference • 1,188 pallet positions • lower equipment count and simpler initial qualification.

AQI-D4 master plan
D4 • STRATEGIC GROWTH

Two production trains

138,335 sq. ft. compact building concept • 3,564 pallet positions • duplicated production trains and approximately 2× nominal capacity.

Decision domainAQI-D3AQI-D4Executive implication
Pharmaceutical central utilities

ENGINEERING BASELINE

Process, clean utilities, HVAC and electrical infrastructure

Verified reference duties presented as proposal assumptions pending detailed vendor and site confirmation.

SystemDesign basisCleanroom / locationPrimary utility

READ-ONLY DATA CONSOLIDATION

Site, building and controlled-environment baseline

Missing factual content incorporated from the reference dashboard and reformatted for the independent V10 proposal.

Source library ↗

CLEANROOM PRESSURE CASCADE

Grade A → B → C → D

Dedicated hygienic AHUs and DDC control maintain the cascade through production rooms, PALs and MALs.

A+50 PaUDF 0.45 m/sB+40 Pa45 ACHC+30 Pa30 ACHD+15 Pa20 ACH
PAL 1 • CNC → Grade D

Street-clothing removal, hair covering, step-over bench, hand wash and HEPA drying, Grade D garment and footwear.

PAL 2 • Grade D → C

Non-linting jumpsuit, hood, goggles, clean boots and nitrile gloves. No sinks in Grade C.

PAL 3 • Grade C → B

Sterile jumpsuit, over-boots and sterile gloves through interlocked doors. No sinks in Grade B.

Engineering validation and regulatory packages

DELIVERY FRAMEWORK

12 master engineering, validation and regulatory packages

One document architecture linking design, procurement, construction, qualification and licensing.

IFC engineering coordination

CONSTRUCTION COORDINATION

IFC discipline suites

Six coordinated discipline packages covering structure, electrical, clean utilities, storage, HVAC and cleanroom architecture.

Project drawing catalog

SOURCE CONTROL

Project drawing catalog

18 supplied PDF and DWG references retained as the traceable design basis.

COMMERCIAL READINESS

Seven-division unpriced tender BOQ

Twenty-eight quantified line items covering civil/structural, cleanrooms, process equipment, clean utilities, HVAC/BMS, electrical/backup power and high-density racking.

Expanded project board